
GRN Bi scores a site across eight bankability dimensions — power, grid, land control, permitting, environmental and social risk, community impact, logistics and counterparty — then benchmarks it against comparable transactions and returns a valuation range you can put in front of a credit committee.
Built on 100MW+ of closed power transactions across four continents.
Track Record
GRN Bi's comparables set comes out of GRN Energy's own deal book. Every site we scored, we also had to transact.
100MW+
Power closed across four continents
150MW
Equipment sourced
10MW+
AI capacity matched to operators
The Problem
Lenders, developers and landowners have no standard benchmark for infrastructure-readiness. Every assessment starts from zero, and deals stall while it gets rebuilt.
Queue position, congestion zone and substation distance get discovered in diligence, not in screening. Projects lose months to grid risk that was visible on day one.
Water draw, local grid displacement and community objection now stop more powered-land projects than engineering does — and none of it appears in the screening pack.
Sites with substation, fiber and water proximity rarely capture a premium, because there is no market comparable to argue from and no sequence for building toward one.
What GRN Bi Does
A bankability score, a valuation range, a risk register and a diligence checklist — generated for one site, or ranked across a portfolio of candidates.
AI Site Scoring
Eight-dimension bankability score, 0–100, with the evidence behind every dimension.
Comparable Valuations
Market comps for powered land that reflect the real premium infrastructure sites command.
Risk Register
Structured risk table with severity, evidence and mitigation — ready for diligence packages.
Diligence Checklist
Auto-generated diligence items tailored to your use case and jurisdiction.
What The Score Measures
What can be built
01
Contracted capacity, energization date, firmness and curtailment exposure, behind-the-meter options.
02
Queue position and vintage, substation proximity, congestion zone, upgrade cost allocation.
03
Ownership or option structure, tenure, easements, zoning classification, encumbrances.
What will be allowed
04
Consents held versus required, sequencing, statutory timelines, jurisdictional precedent.
05
Water draw, emissions and grid carbon, biodiversity, land use and resettlement. Mapped to EP4 / IFC Performance Standards categories.
06
Jobs, tax base, local offtake and grid contribution, workforce development, stakeholder position.
What can be delivered
07
Fiber routes and latency, water and cooling, road and port access, seismic, flood and heat exposure.
08
Offtake and sponsor quality, EPC availability, equipment lead times, capex/opex envelope, risk allocation.
Who It's For
Data Center Sites
Tier 0–4, AI / HPC, co-location. Score grid proximity, fiber, cooling and power redundancy.
Solar + BESS
Utility-scale renewable projects. Assess interconnection, permitting and climate resilience.
Powered Landowners
Unlock the hidden premium in your land portfolio. Benchmark against infrastructure comps.
Infrastructure Investors
Standardized bankability scoring across a portfolio of candidate sites, ranked side by side.
Our Ecosystem
GRN Bi is the intelligence layer. Our ecosystem covers the full infrastructure deal stack.
Powered Land
GRN Energy
We advise on and source powered land transactions — connecting landowners with energy developers as a trusted infrastructure consultant, not a marketplace.
Energy Infrastructure & Equipment
VoltSupply.io
A curated B2B platform for transformers, switchgear and energy hardware — the supply chain layer for energy infrastructure projects.